Q: Is the funding secure?

A: 

Q: Why is the culvert being upgraded?

A: The existing culvert has limited capacity and is in poor condition, which contributes to flooding during heavy rainfall.

Q: Will this project stop flooding completely?

A: The project will significantly reduce flood risk, but extreme weather events may still cause flooding.

Q: How long will construction take?

A: Construction is expected to take approximately 12 - 18 months and will be carried out in phases.

Q: Will roads be closed during works?

A: Temporary traffic management will be required, but access will be maintained where possible.

Q: Will businesses be affected?

A: Efforts will be made to minimise disruption, and access to businesses will be maintained as far as possible.

Q: Why are pumping stations needed?

A: Pumping infrastructure may be required to manage surface water in low-lying areas, particularly during high tides or heavy rainfall.

Q: What happens to the existing culvert?

A: Sections of theThe existing culvert will be replaced or upgraded as part of the project.

Q: Will there be noise during construction?

A: Some noise is expected, but it will be managed in line with environmental guidelines.

Q: How will traffic be managed?

A: A set of traffic management plans will be implemented during construction to maintain safe access.

Q: Will the harbour be affected?

A: Measures will be in place to protect water quality in Bantry Harbour. Wastewater will no longer be discharged to the harbour once the project is completed.

Q: Is the project environmentally safe?

A: Yes, environmental protection measures will be implemented throughout construction.

Q: Will the works affect heritage buildings?

A: The project will be carefully designed and constructed to protect nearby heritage structures.

Q: How can I provide feedback?

A: You can provide feedback during public consultation events or via the contact details provided.

Q: What is the benefit of separating disconnecting the foul and surface water network from the culvert?

A: It will improve thes water quality in the harbour and reduces pressure on the drainage systemwill increase the capacity of the surface water drainage network.

Q: Will the project consider climate change?

A: Yes, the design will account for future climate conditions and including increased rainfall intensity and higher tide levels.

Q: Who is delivering the project?

A: Cork County Council.